Мы свяжемся с Вами в ближайшее время.
Major repair and reconstruction
Reconstruction allows you to breathe new life into your business and significantly increase the capacity of your facilities
- industrial facilities
- gas and oil refining facilities
- gas pipelines with subsequent pipe processing
- road transport infrastructure
- civil architecture
In 2025, Gazstroyprom is carrying out reconstruction work at the Kirinsky, Urengoy, Zapolyarny, Yamburg, and Astrakhan fields.
Active work continues on such main gas pipelines as Urengoy — Peregrebnoye — Ukhta and Sakhalin — Khabarovsk — Vladivostok.
As part of the Ethane project, the linear part is being reconstructed to transport ethane-containing gas to the Baltic Sea coast. The total length of the gas pipeline sections under construction is 585 kilometers.
total length of work sites
kilometers
Gazstroyprom is also carrying out projects to modernize underground gas storage facilities in various regions of the country. In 2025, work is underway at the Stapnovskaya UGS facilities, the Moscow UGS facility, the Shchyolkovo UGS facility, and the Saratov UGS facility.
recycling
Gazstroyprom has adopted a federal policy of lean production, which allows for efficient use of available resources.
One of the problems that has already been solved is the disposal of outdated main gas pipeline pipes. In Astrakhan, a recycling project has been implemented, where used pipes are converted into iron reinforcement.
The plans for 2025 include the processing of about 360,000 tons of pipes and over 60,000 tons of scrap. The resulting products are used not only on the company's construction sites but are also sold on the market.
thousand
tons of pipes
thousand
tons of scrap